Case study / Data center
Significant heating inside a fused rooftop disconnect supplying CRAC cooling equipment, consistent with poor contact at the knife blade.
Serious
FacilityData center
ScaleCommercial data center
EngagementAnnual infrared inspection
Max temp169.2°F
Delta T92.8°F
The situation
Inspection of rooftop electrical equipment and cooling disconnects supplying CRAC systems protecting the data center main hall.
The finding
Significant heating inside a fused rooftop disconnect supplying CRAC cooling equipment, consistent with poor contact at the knife blade.
The outcome
Identified before disconnect failure. Scheduled for replacement during an overnight maintenance window, avoiding an unplanned cooling loss in the main data hall.
Related industry: Data Centers
Want Infinite Infrared to inspect your facility?
See how an electrical infrared inspection can help identify developing problems before they become outages or safety concerns.
Ready to find the problems before they find you?
See a real sample report, or request an inspection for your facility.